Over 10 Pump Room Upgrade
Back to Projects
Fire Fighting

Over 10 Pump Room Upgrade

Factory Egypt successfully upgraded more than 10 fire pump rooms across multiple Pepsi branches, enhancing system capacity, performance, and reliability. Each pump room was redesigned and upgraded to meet the required flow rates and fire protection standards, transforming existing non-UL/FM-approved pump rooms into fully UL/FM-compliant systems.

Location

Egypt

Year

2020 - 2026

Client

PepsiCo

Project Overview

Factory Egypt successfully upgraded more than 10 fire pump rooms across multiple Pepsi branches, enhancing system capacity, performance, and reliability. Each pump room was redesigned and upgraded to meet the required flow rates and fire protection standards, transforming existing non-UL/FM-approved pump rooms into fully UL/FM-compliant systems.

Scope of Work

PepsiCo October DC
PepsiCo Madinat Nasr DC
PepsiCo Ismailia DC
PepsiCo Sohag DC
PepsiCo Minya DC
PepsiCo Bani Suef DC
PepsiCo Fayoum DC
PepsiCo Haram DC
PepsiCo - Monofia DC
PepsiCo Mansoura DC
PepsiCo Damietta DC

Challenges

  • Managing upgrades across more than 10 locations simultaneously created logistical and coordination challenges, especially in maintaining consistent quality and timelines.
  • Each branch had different layouts, equipment conditions, and design limitations, making it difficult to apply a single upgrade approach.
  • Ensuring compatibility between new upgraded components and existing fire protection systems across all sites.

Solutions

  • Developed a centralized project management plan with clear scheduling for each site.
  • Implemented strict quality control procedures across all sites.
  • Conducted detailed site assessments for each location.
  • Customized design and engineering solutions based on site conditions.
  • Adapted installation methods to fit existing infrastructure constraints.
  • Conducted comprehensive testing and commissioning for each pump room.